Investing & partnership

Big ideas.
Close to home.

We love following SpaceX, Nvidia and the wider market. But imagine seeing your investment help local talent flourish, local businesses adapt and good ideas become useful work—right here where you live.

Seven ways to build with us

Find your place.
Take the first step.

Choose an opportunity to see the practical details. These are starting points for discussion; Tink Town remains in development.

01 / Provide the foundation

Provide a home.

Help provide a home for a River Tech school, Tink Town, or both. We are looking for practical space in North Idaho that can be approved for the activities it will actually host.

How this could work

A zoning designation and an occupancy approval answer different questions. Planning must allow the use; building and fire officials must approve the building for it. An office, retail unit or church building is not automatically ready for a school or a café and workshop.

A practical starting point

The space to make it work.

Three ways to give the vision a home. The Tink Town and combined-site figures describe the fuller facility—not the space needed to launch. These working estimates include indoor support space and circulation; parking and outdoor recreation space are additional.

See how Tink Town can start small and grow through three phases ↗

LocationCompact planning rangePreferred search range
River Tech school7,000 sq ft8,000–9,000 sq ft
Tink Town · fuller hub6,500–7,000 sq ft7,500–9,000 sq ft
School + Tink Town12,000–13,000 sq ft14,000–17,000 sq ft
School: about 90 students — room-by-room plan

Six teaching rooms averaging 15 students, with staggered lunches and no dedicated gym or auditorium.

SpaceSq ft
Six classrooms, about 500 sq ft each3,000
Lunch / multipurpose room900
Indoor recess / student hangout600
Principal, staff and board / conference room600
Storage and utility space400
Restrooms300
Hallways, walls and circulation1,500
Illustrative total7,300
Tink Town: café, shop and production — room-by-room plan

A compact operation with a small performance stage, modest café kitchen and a selected mix of fabrication and printing equipment.

SpaceSq ft
Café seating and small stage1,000
Kitchen, counter and preparation500
Robotics, components and maker-supply retail500
Fabrication, marketing printing and 3D printing combined1,500
Design workstations and collaborative work800
Materials, receiving and order storage700
Restrooms and utility space400
Additional circulation and walls1,300
Illustrative total6,700
Combined location — how sharing saves space

The two illustrative plans total 14,000 sq ft. Sharing about 1,500 sq ft through a kitchen, lunch / performance room, conference space and selected support areas gives a compact example of 12,500 sq ft. Around 14,000 sq ft is our starting search target, with more room where the layout or growth plans call for it.

Shared rooms need compatible schedules. The school needs controlled access, and fabrication must be separated from students, customers and food service.

These are planning estimates, not approved building plans or legal occupancy limits. The 1,500 sq ft production allowance must be checked against selected equipment, safe working clearances and material flow. Final capacity depends on the property layout and required approvals.

For a River Tech school

Our planning target is an average of about 15 students per teaching classroom. Some rooms may accommodate 12 if larger rooms keep the school-wide classroom average near 15. This is our operating requirement, not a legal occupancy formula.

  • School use must be permitted by the zoning district or approved through the required land-use process. There is not one universal “school zoning” label.
  • Classroom layouts must fit students, a teacher, furniture and clear circulation. The building official determines permitted occupant loads; room dimensions and exits matter.
  • Confirm educational occupancy approval, including any change-of-use permit and certificate of occupancy required for the premises.
  • Check compliant exits and travel paths, emergency lighting and signs, alarms, extinguishers, fire separations, and sprinklers where required.
  • Check accessible entry and circulation, suitable toilets, ventilation, lighting, and safe arrival and pickup arrangements.

For Tink Town

Tink Town can begin without a dedicated venue, then grow into a small public hub and eventually a fuller café and workshop. The requirements below describe that fuller facility, not a day-one lease. See the three-phase launch plan on the Tink Town page.

  • Front of house: café counter and seating, a place to discuss projects and display finished work, and flexible space for workshops and events.
  • Work areas: desks for design, AI and marketing work; a clean print-production and finishing area; and a dedicated 3D-printing area.
  • Fabrication: enclosed space for laser cutters, a waterjet, CNC routers and mills, metal bending, assembly and finishing. Separate noise, dust, fumes and production traffic from customers and food.
  • Support space: sheet and stock storage, paper and consumables, loading and receiving, finished orders, toilets and staff facilities.
  • Our working allocation is 1,500 sq ft for fabrication, marketing printing and 3D printing combined, with materials storage allocated separately. Confirm the selected machines and their operating and service clearances against a floor plan.
  • Assess electrical service, floor loading, delivery-door sizes, ventilation and dust extraction, compressed air, and water and drainage requirements for the chosen equipment.
  • Confirm permission for the full mix of café, retail, classes, events and fabrication. A commercial or flex-industrial property with an approved public-facing area may be a better fit than a conventional storefront.
  • In Post Falls, Community Commercial Services is a starting point to investigate for restaurant, retail and education uses; the actual fabrication processes need a separate use determination.
  • Obtain the applicable building, fire and food-service approvals. A café requires health review; cooking and fabrication equipment may require dedicated ventilation or fire protection.

Fire protection: check the building, not just its listing

Sprinkler requirements depend on the occupancy, fire area, occupant load, floor level and local amendments. The 2018 model code includes Group E school triggers such as a fire area over 12,000 square feet and certain spaces below the exit-discharge level. Mixed café, event and workshop uses can trigger different requirements. A small school is not automatically exempt. Obtain a property-specific determination from the building and fire officials.

Bring to the first conversation

  • Address, floor plan, room dimensions and the intended use: school, Tink Town or both.
  • Existing zoning, certificate of occupancy, sprinkler and alarm information, and any prior approvals.
  • Availability, rent expectations, parking, utilities and willingness to make necessary improvements.

Agree before starting

  • Written confirmation of permitted uses and the route to building, fire and health approvals.
  • A viable classroom layout or café/workshop plan, including costs of any conversion.
  • Rent, lease length, responsibility for improvements and the conditions that must be met before occupancy.
Property guidance and sources

Screening guidance for North Idaho, researched October 2026. Requirements depend on the address, jurisdiction, existing approvals and proposed activities. Confirm the property with planning, building, fire and health officials before committing.

Your first step

Send the address and floor plan first. We can screen the fit, then discuss the property with the relevant officials before agreeing to a lease.

Tell us about your property
Building the first Tink Town

A practical order
for an ambitious idea.

Start with the work, prepare what it needs and grow from the results. Phase budgets are estimates; opening dates and funding commitments are still to be agreed.

  1. 01 / Define

    Choose the first work.

    Identify local needs, a useful starting offer and the people needed to deliver it.

  2. 02 / Prepare

    Fit the place to the plan.

    Match premises, equipment and approvals to the work. Agree the operating and funding arrangements.

  3. 03 / Prove

    Open, learn and improve.

    Begin with work we can deliver, measure the results and expand where demand supports it.

A shared starting point

Clear expectations.
A useful relationship.

The River Tech concept is in practice in Post Falls. Tink Town’s location, services and operating arrangements are still being developed.

Each opportunity begins with a conversation about fit, responsibilities and what both sides need. Any financial terms require a separate written agreement; the 6% lending rate is a working proposal.

This page invites exploratory conversations. It does not offer securities or set investment terms.

Meaningful capital. Local impact.

A smaller investment.
A meaningful impact.

A commitment in the tens of thousands could help Tink Town take a meaningful first step: equipping a small workspace, adding useful production tools or launching services for local businesses.

For someone with a larger investment portfolio, that could be a relatively small allocation. For a young local enterprise, it could be the difference between an idea on paper and useful work getting done.

And the impact can happen close to home: local talent developing, businesses adapting and people finding practical help with problems that matter to them.

A smaller share of your portfolio.
A substantial part of our beginning.

See how Tink Town can start small
Put an amount beside the ambition

What could your
capital help build?

Back a defined step. Tink Town can launch as a lean service business, then grow into a public hub and a larger workshop as demand supports it.

Illustrative phase funding · 2026 USD
The stepPlanning rangeBasis
Phase 1 · Service launch$20,000–$40,000Launch funding
Phase 2 · Small hub$100,000–$200,000Additional funding
Phase 3 · Expanded workshop$350,000–$800,000Additional funding

Each range includes setup, a contingency allowance and three months of operating cash. Later figures are additional funding, not totals to date. The example scenarios are $30,000, $150,000 and $600,000 respectively; full founder salaries, financing payments and a building purchase are excluded.

Explore the phase budgets and assumptions

Not sure where you fit? Let’s talk.

Start a conversation